VLF and Cable Diagnostics Primary and Secondary Current Oil Testing Resonant and Impulse Test  
Insulation Test Cable and Fault Location High Voltage Transformer Test  

   Home | About Us | Contact Us | Site Map | All Products |
                                                                                    |
Spinlab Utility Instrumentation | CT Testing 3-Phase Meter Test | 6000 Bird Dog Plus

 
   

Model 6000 Bird Dog Plus -- CT Test and 3-Phase Meter Test
 

Overview
This new and exciting true Three-Phase Bird Dog Plus enables you to determine the accuracy of any meter in the field - from Form 1 through to Form 17. Electronic sensors allow you to automate the test to gain the highest possible accuracy, The process is fast, simple, and much less expensive than a portable test board for the meter test and still perform ratio and burden tests on your CTs (CT Tester).

 
 



 

Feature/Benefits Model 6000 Bird Dog Plus
  • Accuracy 0.2% of reading using direct connect.
  • Live 3-phase vector plot on screen of instrument.
  • Perform a single meter verification test on 3-phase self-contained meter types: Form 14  Form 15  Form 16  Form 17.
  • You can also perform a single meter verification test on all CT rated meters.
  • Test residential meters.
  • 3-phase Demand Meter Testing for kW, kVAR, and kVA.
  • Testing time for meter verification is less than 10 minutes.
  • Save pdf files and e-mail reports direct from SpinGraph software.
  • 3 Current probes - for all meters - 0.75" ID - 0.5A to 100A.
  • 3 Current probes - for residential and 3-phase meters - 2" ID - 10A to 1000A
  • 3 duckbill connectors for connection to your CT rated meter circuit - .1A to 20A
 
         
 

  Our Partners -- Your links to our Quality Products